header
bullet  Home

bullet  General Background

bullet  MI Program & Orgn. in States

bullet  Census of MI Schemes

bullet  Methodology in MI Census

bullet  Concept & Definitions

bullet  Format of Schedule

bullet  Results & Findings

bullet  Charts

Methodology of Minor Irrigation Census

The MI Census data are collected through canvassing three different enumeration schedules. One of the schedules is the village schedule which was canvassed by the enumerators through enquires from patwaries/ villages level workers/ gram pradhans, and the information from revenue or land records maintained in the government records. The other two schedules were canvassed by enumerators through enquiries from the owners of the schemes. These two schedules relate to ground water and surface water schemes. The fieldwork of the census was either undertaken by the nodal department itself or entrusted to some other agency which the State/UT governments considered fit considering infrastructures available with them. However, for the entire census operation, Minor Irrigation Census Commissioner, was the pivotal point. The primary work of collection of data was carried out by the enumerators, who were village level workers or village accountants or Lekhpals or Patwaries or a combination of these as the case may be. The work of supervision was entrusted to the next superior officer of the field agency by the State/UT; they were Block Level Officers or Sub-Divisional Officers.

In order to increase the reliability of data, sample check was conducted before finalising the data. Systematic sampling technique was adopted for 5 percent sample check at the district level. As such one out of every 20 villages was selected for sample check by the concerned supervisory officer. The procedure for identifying the village for supervision was also specified in the guidelines.

Selection of Primary Enumerators

The nodal department of State/UTs was responsible for selecting a particular agency as primary enumerator. It could be the Village Level Workers/ Patwari / Panchayat Inspector / any other agency suitable in a particular region. In selecting such agencies as enumerators the nodal departments were required to ascertain that they would have appropriate association with the farmers. The information required in the primary schedules were obtained by personal inquiries from the farmers and physical verification/observation by the enumerators in respect of a particular scheme.

Training Programme For Data Collection

Training cum workshops were organised by the Minor Irrigation Census Commissioners at the State Headquarters in which the District Level Officers participated. A representative from the Centre was an Observer in such workshops. The details of the methodology adopted for the Census, its procedure, concepts and definitions were discussed thoroughly and necessary clarifications were given. The instructions for filling up the primary enumeration schedules were also discussed during the workshops. In turn, the District Level Officers organised training programmes at district headquarters where the primary enumerators participated. The instructions for filling up the primary enumeration schedules were explained thoroughly in such training programme.

Procedure For Conducting Census Operation

The Primary enumerators while canvassing the schedules visited the owner of the minor irrigation scheme or its next neighbour in case of absence of owner and collected information on the basis of personal enquiry from him. The purpose of the census was explained to the farmers to win over their confidence in giving the specific information in respect of minor irrigation works. Information relating to the schemes was collected by the enumerators by physical examination of the scheme also.

After filling up the schedules, the enumerators were required to submit all completed schedules to the Block Development Officer/Officer in-charge at the block level. The block level officer submitted all the schedules to the district level officer concerned who computerised the data contained in the filled in schedules and passed on the floppy containing data as well as the schedules, to the Minor Irrigation Census Commissioner of the State/UT.

Computerisation of Census Data

The processing of Census data was taken up by the National Informatics Centre (NIC). They had developed necessary software for computerizing the Census data. The softwares were provided to State Minor Irrigation Census Commissioners for computerizing the Census data. Wherever necessary, private consultants/ agencies were hired by the Minor Irrigation Census Commissioners for computerising the schedules, according to software provided by NIC. The work was taken up at the district headquarters to facilitate data handling. It also minimized delays in computerization work. Data collected was entered in computer media after duly ascertaining the correctness and was passed on to the Minor Irrigation Census Commissioner at the state level. A copy of the data file was sent to the centre by the State Minor Irrigation Census Commissioners. At the State headquarters, State Minor Irrigation Census Report was brought out for which uniform tabulation plan was finalized by the Statistical Cell in MOWR. The census data received from the States at the Central Statistical Cell was utilized for compiling National Level Minor Irrigation Census Report.

4th MI Census Reports
National Level
bullet  Dugwell
bullet  Shallow Tubewell
bullet  Deep Tubewell
bullet  Surface Flow Schemes
bullet  Surface Lift Schemes
bullet  Integrated Reports
State Level
bullet  Click here to select state
 
Related Links
bullet  3rd MI Census
bullet  2nd MI Census
bullet  M/o Water Resources
bullet  CWC, MoWR
bullet  CGWB, MoWR
     

  Disclaimer    |     Contact us       |     Policies  
  This site is designed, Developed and hosted by
National Informatics Centre (NIC) , DeitY, MoCIT, Government of India.
The content is provided and maintained by Ministry of Water Resources